Season 2, Episode 8

Bad Bath and Beyond

Sachin and Divya hired a contractor to convert their huge master bathroom into a beautiful oasis, but after giving him their final payment, he took off and they never saw him again. Now they are left with a half finished space with paint on some walls and demo debris including their original tub left behind. John DeSilvia and his team come to their rescue, discovering that their original contractor left them not only with a mess, but a dangerous situation when he cut through a major support beam to fit in the shower drain pipe. JD has to start from scratch and comes up with a new layout and turns the oversized space into the bathroom and walk in closet of Sachin and Divya's dreams.
See Tune-In Times
Water Water Everywhere
Besting Asbestos

On TV

Follow Us Everywhere

Join the party! Don't miss HGTV in your favorite social media feeds.

Luxury Home Giveaways

HGTV Smart Home

A sophisticated modern home in Atlanta, Georgia

HGTV Dream Home

A gorgeous getaway on Anastasia Island, Florida

HGTV Urban Oasis

A Southern-inspired escape in Louisville, Kentucky